Drains tied into the city system
Toledo requires storm drains inside the lot tied to the nearest outlet, and the city's public utilities department sets the rules and signs off, so we put those drains into the layout from the start.
If your lot has cracks, sinking spots and pooling water, we'll build a concrete lot graded so rain runs to the drains.

Concrete parking lot building in Toledo, OH means paving the spaces, aisles and driveways with concrete and grading them so rainwater runs to drains in the lot or to a storm system, which leaves you a paved lot with no dust or mud. We're based in Toledo and build across the cities around it in northwest Ohio and southern Michigan.
Parking lot calls usually come from business owners with a lot that's cracked, sinking or holding water, or a patch of ground they need to pave for customers and deliveries. The price mostly follows the size of the lot and how many spaces it holds, how much digging and base work the ground needs, how thick the slab has to be for the traffic it'll carry, and how many drains have to go in. The schedule turns on the city's review and permit, the weather, and curing, the days fresh concrete needs to gain strength before cars drive on it. When I come out, I walk the lot, measure it and write down what's included and what isn't, so you have your own figure to work from.
I come out to every job, measure it and write the estimate myself, then stay on site with our crew, so the person who planned your lot watches it get built.
We pull the permits our work needs and check the rules with the city before we start, so you know who's involved. We're licensed and fully insured.
Concrete is hard to undo once it's poured, so I'd rather tell you something you don't want to hear while we're standing on the lot than have you find it out a year later.
We plan the drainage first, because where the water goes sets the slopes, the drain spots and the layout of the whole lot, and I'll ask where delivery trucks will drive so we build those lanes with them in mind. Then we dig out the soft soil and pack the subgrade, the ground the slab sits on, because a base that's only raked level settles with the dirt and pulls the concrete down with it. We set the forms, lay rebar where the plan calls for it, since that steel helps hold the slab together, and pour early in the day when we can, because midday heat leaves a weak, dusty top. The surface gets a broom finish, a light ridged texture that gives tires and shoes some grip when it's wet, and we cut control joints, shallow grooves that give the concrete a straight place to crack instead of wandering across a space, while it's still fresh. Then it cures, the waiting days while it gains strength, before anyone parks on it. If the budget gets tight, I'll cut somewhere other than the base, because it's buried on day one and it's the one part you can't fix later without tearing out the lot.
Some lots need work around the edges too. Light poles, sign posts and a dumpster enclosure each need concrete footings to hold them steady, and we pour those as part of the same plan. If the building beside the lot has settled and sits low, foundation raising can bring it back up first, so the new lot meets the doorways at the right height and water runs away from the walls.
Toledo requires storm drains inside the lot tied to the nearest outlet, and the city's public utilities department sets the rules and signs off, so we put those drains into the layout from the start.
The city reviews lots of 5 to 59 spaces on one site plan review track and lots of 60 or more on a larger one, so counting planned spaces early shows which applies.
The city requires landscaping along lot edges next to a street or driveway, or in view of the property next door, so we leave room for planting when we lay out the concrete.
Repaving an older lot in Toledo takes permits and plan review when it changes or enlarges the footprint of the base or the driveway approach, or when regrading changes where the stormwater goes.
Send the form and we'll reply within one business day to set a time. I'll walk the lot, measure it and write down what's included and what isn't, free and with no obligation.
Have the lot's rough size and a count of the spaces you're planning, because together they shape the layout and tell us which city review your lot will go through.
Tell us if delivery trucks, garbage trucks or other heavy vehicles will use the lot, and where they'll drive, so we can plan those lanes for the extra weight.
Note where puddles form and which way rain runs off today, since that's the first thing I'll look at when I walk the lot and it shapes the whole plan.
These photos show broom finishes, joint layouts, edges and drains you can point to when we talk through the plan for your own lot.
These are the questions Toledo property owners usually ask before they pave a lot, answered the way I'd answer them on site.
No, Toledo doesn't allow a gravel parking lot. The city requires spaces, aisles and driveways to be paved with concrete, asphalt or another dust-free surface, and gravel or loose fill doesn't count. So the real choice is concrete or asphalt, and at the estimate I'll tell you plainly what concrete does well for your lot and what it won't.
A concrete lot can last many years with little upkeep when it's built right. One industry guide says concrete lots built with suitable procedures can be economical and give satisfactory service for many years with little maintenance. That's why we put our time into the base and the drains, and the work is backed by our satisfaction guarantee.
Concrete made with entrained air, a network of tiny, evenly spread bubbles, can give the slab room to relieve pressure as it freezes. More air may be required where heavy use of salt or other deicer is expected. So tell me at the estimate how heavily you plan to treat the lot in winter, and we'll plan the mix around it.
Toledo requires a permit to build or change a parking lot with more than five spaces. Maintaining an existing lot within its present footprint doesn't need one. For a smaller lot, I'll check with the city before we start, and when a permit is needed, we pull it ourselves.
It can, because Toledo's stormwater charge goes with how much hard surface your property has, and a new lot usually adds hard surface. Non-residential owners can earn credits that lower the charge by using practices that cut a property's stormwater impact, so it's worth looking at the city's stormwater program while the lot is still on paper.
Call (419) 392-9683 or send the form, since the city's review comes before the pour and the earlier I measure, the earlier it can start.